Applicability of the Deed of Agreement for Unilateral Termination of the Build Operate Transfer (Bot) Cooperation Agreement After the Court's Decision

Rostna Qitabi Anjilna

Abstract


The Government of Indonesia uses the Regional Revenue and Expenditure Budget to finance infrastructure development and regional development. To avoid high development costs, the government opens up opportunities for the private sector to invest in state assets (land) with the Build Operate Transfer system (hereinafter referred to as BOT). In the BOT model, the government permits the private sector to build and operate the project for a certain period. As an unnamed agreement, there has been no specific arrangement regarding cooperation with the BOT system. Therefore, the BOT agreement was born based on the freedom of contract as regulated in Article 1338 of the Civil Code. This agreement tends to cause legal problems such as unlawful acts. This research method is normative with secondary data sources using primary, secondary, and tertiary legal materials. In the event of unilateral termination of the BOT agreement, it still refers to Article 1266 of the Civil Code. If one of the parties has not fulfilled all the elements contained in Article 1266, the responsibility for unilateral termination is compensation.

 

Keywords: Unilateral Termination; Build Operate Transfer, Enforcement of Deed of Agreement


Full Text:

PDF

References


Fuady, Munir. (2013). Perbuatan Melawan Hukum Pendekatan Kontemporer. Bandung: Citra Aditya Bakti.

Isnaeni, Moch. (2013). Perkembangan Hukum Perdata di Indonesia, Asas Proposionalitas dalam Kontrak Bisnis. Yogyakarta: Laksbang Grafika.

Kamilah, Anita. (2020). Bangun Guna Serah Build Operate and Transfer Perspektif Hukum Agraria, Hukum Perjanjian dan Hukum Publik. Bandung: CV. Keni Media.

_____________. (2014). “Kedudukan Perjanjian Bangun Guna Serah BOT Dalam Hukum Tanah Nasional”. Jurnal Ilmu Hukum Litigasi. 15. (1). 2134-2181.

Marzuki, Mahmud Peter. (2005). Penelitian Hukum. Jakarta: Kencana Prenada Media Group.

Maulana, Aceng. (2016). “Faktor Penyebab Terjadinya Contract Change Order Dan Pengaruhnya Terhadap Pelaksanaan Proyek Konstruksi Pembangunan Bendung”. Jurnal Infrastruktur. 02. (02). 40-51.

Rakhman, A.A., Pitono, Utami, M.W.B. (2020). Pepres No 16 Tahun 2018 dan SPSE 4.3: Panduan Dokumentasi Perencanaan, Pemilihan Penyedia, dan Kontrak Pengadaan Pemerintah. Jakarta: Gramedia Pustaka Utama.

Rohani, A.A., Gunawati, A., Nasrudin, U. (2011). Pengantar Hukum Perdata Materi dan Perkembangannya. Bandung: PT. Alumni.

Syaifuddin, Muhammad. (2012). Hukum Kontrak. Bandung: Mandar Maju.

Wirana, Pachta Andjar. (1995). Laporan Akhir Tim Penyusunan Naskah Akademis Peraturan Perundang-Undangan Tentang Perjanjian BOT. Jakarta: Badan Pembinaan Hukum Nasional Departemen Kehakiman.

Wirjono, Prodjodikoro. (1992). Asas-Asas Hukum Perdata. Bandung. PT. Sumur.




DOI: https://doi.org/10.20884/1.atc.2022.5.2.270

Refbacks

  • There are currently no refbacks.


 

Indexed By:

 


Authentica: Privat Law Journal
Faculty of Law, Universitas Jenderal Soedirman
Yustisia IV Building, Law Journal Center
Purwokerto, Central Java, Indonesia, 53122
Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.